欧美日韩国产一区二区三区不卡,麻豆1区2产品乱码芒果白狼在线,WWW国产精品内射老熟女,99久久精品费精品国产一区二区,人妻精品成人免费视频,成人丝袜激情一区二区,美女人妻动态免费视频,色噜噜国产精品视频一区二区,黑人无套高潮国产精品,国产成人av午夜福利

  • <strike id="qo0um"></strike>
    <strike id="qo0um"><menu id="qo0um"></menu></strike>
    <strike id="qo0um"><input id="qo0um"></input></strike>
    
    
  • <abbr id="qo0um"></abbr>
  • Tel:0576-8917-1999 Fax:0576-8917-1987

    Wap Wecat 中文版 English


    Technical

    The company has the foreign trade proprietary import and export right, the product sells the domestic, the foreign market, has higher awareness and Reputation, the credibility of the enterprise.

    Installation

    時間:2016-07-09 10:43:35點擊:次

    1. Assemble proper materials  for  the  job (proper cement, primer and applicator for the size of piping system to be assembled)
    2. Pipe must be cut as square as possible. Use a hand saw and miter box or mechanical saw .A diagonal cut reduces bonding area in the most effective part of the joint.
    3. Plastic tubing cutters may also be used for cutting plastic pipe ; however ,some produce a raised bead at the end of the pipe. This bead must be removed with a ile or reamer, as it will wipe the cement away when pipe in inserted into the itting.
    4. Remove all burrs from both the inside and outside of  the pipe with a knife,  file or  reamer. Burrs can scrape channels into pre-softened surfaces or create hang-ups inside surface walls.
    5. Remove dirt, grease and moisture. A thorough wipe with a clean dry rag is usually suficient.(moisture will  retard cure and dirt or grease can prevent adhesion)
    6. Check pipe and ittings for dry it before cementing. For proper interference fit, fitting should go over end of pipe easily but become tight about 1/3 to 3/4 of the way on . Too tight a fit is not desirable ;  you must be able to fully bottom the pipe in the socket during assembly . If the pipe and ittings are not out of round , a satisfactory joint can be made it .
    7. Use the  right applicator  for the size of pipe or fittings being  joined. The applicator size should be
    equal to 1/2 the pipe diameter. It is important that a satisfactory size applicator be used to help ensure that suficient layers of cement are applied.
    8. Priming: the purpose of a primer is to penetrate and soften the surfaces so they can fuse together.The proper use of a primer and checking its softening effect provides assurance  that  the surfaces are
    prepared for fusion in a wide variety of conditions. Because weather conditions do affect priming and cementing action, repeated applications to either or both surfaces may be necessary. In cold weather ,  more time is required for proper penetration.
    9. Using the correct applicator (as outlined in step7), aggressively work the primer  into fitting socket,keeping the surface and applicator wet until thesurface has been softened. More applications maybe needed  for hard surfaces and cold weatherconditions. Re-dip  the applicator  in primer asrequired. When the surface is primed, remove anypuddles of primer from socket.
    10. Next, aggressively work the primer on to the end of the pipe to a point 1/2” beyond the depth of the itting socket.
    11. A second application of primer  in the socket  is recommended.
    12.Immediately ,and while the surfaces are still wet, apply the appropriate。
    13. Cementing; (Still the cement or shake can before using); Using the proper size applicator for the pipesize, aggressively work a full even  layer of cement on to the pipe end equal to the depth of the itting socket do not brush it out to a thin paint type layer, as this will dry within a few seconds.
    14. Aggressively work a medium  layer of cement into the itting socket; avoid pudding cement in the socket. On bell-end pipe do not coat beyond the socket depth or allow cement to run down into the pipe beyond the bell.
    15.Apply a second full, even layer of cement on thepipe.
    16. Without delay, while cement is still wet, assemble the pipe and fittings. Use sufficient force to ensure hat the pipe bottoms in the itting socket. If possible, wist the pipe a 1/4 turn as you insert it. Stop turning when pipe tits bottom.
    17.  Hold  the pipe and  f i t t ing  together   for approximately 30 seconds to avoid push put.
    18. After assembly, a  joint should have a  ring or bead of cement completely around the  juncture of the pipe and itting. If voids in this ring are present, suficient cement was not applied and the joint may be defective.
    19. Using a rag, remove the excess cement from the pipe and ittings, including the ring or bead, as it will needlessly soften the pipe and ittings and does not add to joint strength. Avoid disturbing or moving the joint.
    20. Handle newly assembled  joints carefully until initial set has taken place.



    上一篇:Installation Ⅲ



    中文版 English

    Copyright ? 2017 Zhejiang Huangyan Minghua Plastic Pipe Fittings Co.,Ltd.All Rights Reserve.   浙ICP備11019802號-1  浙公網(wǎng)安備 33100302000346號 XML | Sitemap  Power By:Galaxy


    国内永久福利在线视频图片| 久久久精品国产SM调教网站| 久久国产超碰女女av| 日本精品久久性大片日本| 亚洲欧洲一区二区精品| 国产欧美在线观看一区| av中文字幕国产精品| 最新AV中文字幕无码专区| 免费观看三级毛片| 亚洲欧美日韩中文字幕在线一区| 中文字幕久久精品波多野结| 成人国产精品一级毛片天堂| 宅男噜噜噜66国产在线观看| 免费国产小视频在线观看| 久久频这里精品99香蕉久网址| 四虎国产精品永久入口| 亚洲人妻精品一区二区| 一区二区三区四区亚洲天堂| 免费人成视频网站在线观看不卡| 1000部拍拍拍18勿入免费视频| 日本视频一区二区三区免费观看| 成人午夜大片免费看爽爽爽| 中文字幕第1页在线播| 亚洲综合一二三| 亚洲精品在线国产精品| 久久久国产免费| 亚洲国产精品无码久久久| 精品久久久无码中文字幕一丶| 日韩中文字幕首页一区| 亚洲熟女乱综合一区二区| 中文字幕久热视频在线| 人人爽人人爽人人爽人人片AV| 国产又色又爽又刺激在线播放| 国产成人综合久久精品| 日韩中文一区二区三区| 国产高清在线A免费视频观看| 色综合婷婷| 毛片在线免费观看av| 免费观看男人免费桶女人视频| 国产欧美一区二区三区在线看| 国产精品v欧美|